We are currenty accepting quotes on the following projects:

 

Jul 10, 2020

bids due by 5 PM

Dollar General - Naches, WA

This project consists of construction of a new 9100 SF Pre-engineered Metal Building with related site work, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC and electrical.


We are seeking proposals from trades that would include, but are not be limited to: Surveying, Site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

 

 

Jul 06, 2020

bids due by 10 am

Dollar General - Zillah, WA

This project consists of construction of a new 9100 SF Pre-engineered Metal Building with related site work, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC and electrical.


We are seeking proposals from trades that would include, but are not be limited to: Surveying, Site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

 

 

May 19, 2020

Pending Results from Client

Dollar General - Bullhead City, AZ

This project consists of construction of a new 9100 SF Pre-engineered Metal Building with related site work, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC and electrical.


We are seeking proposals from trades that would include, but are not be limited to: Surveying, Site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

 

 

May 11, 2020

Pending Results from Client

Dollar General - Riddle, OR

This project consists of construction of a new 9100 SF Pre-engineered Metal Building with related site work, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC and electrical.


We are seeking proposals from trades that would include, but are not be limited to: Surveying, Site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

 

 

Please reload

Current projects under construction

Poject will be completed Aug. 2020

Vader Dollar General - Vader, WA

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Project will be completed end of October 2020

Vaneta Dollar General - Vaneta, OR

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Project will be completed November 2020

Brownsville Canine Facility - Brownsville, TX

We are currently accepting subcontractor and vendor proposals for the construction of a new 8,000 sf K9 Facility at the World Trade Bridge Land Port of Entry, Laredo Texas.  The building consists of a pre-engineered building, concrete footings, slab on grade, CMU constructed walls, metal stud framing, drywall, acoustical ceilings, epoxy flooring and many other architectural features/  This project will be starting at the beginning of May for and run for a duration of approximately 8 months.

This project is a Federal project and is subject to Davis Bacon Wages and Federal Regulations.  The project documents are SBU documents and are subject to completion of SBU security documents.  Please email your request for the project documents to proposals@collabconst.com

Project will be completed June 2020

Drive Thru Coffee/Cafe

This project is a Collaborative Construction Solutions, LLC project. We are seeking subcontractor bids for the construction of a 4,151 SF mixed use building. The building includes ground floor retail, a live/work unit and 4 residential units on the second floor. Building is composed of hardie cement panel siding  and brick veneer exterior,  new vinyl windows and aluminum storefront, structural concrete, concrete slab-on-grade, interior finishes, doors and all associated site work. Mechanical - Electrical - Plumbing - Fire Suppression are design build. - This project is anticipated to break ground the end of Feb. 2019. Direct all questions to the Collaborative office, do not contact the owner, Architect or engineers.

Project is Closing - Client Occupied 6/1/2020

Laredo Canine Facility

We are currently wrapping this project up. Thank you everyone that has been involved.

Project is Closing out - Store Opened 6/20/2020

Oakville Dollar General - Oakville, WA

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.