PROJECTS BIDDING

BIDS DUE:

6/23/2021

2 PM

Construction Summary:

This project consists of the construction of a new 10,640 SF Pre-engineered Metal Building with related site work, demolition, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC, electrical and building removal.

We are seeking proposals from trades that would include, but are not be limited to: asbestos abatement, demolition, surveying, site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

BIDS DUE:

6/15/2021

2 PM

Construction Summary:

The project is to include the construction of a new satellite Fire Station for Douglas County Fire District 4 Beebe Site, 23420 US Hwy 97, Orondo , WA 98843. The Fire Station’s main building is to be a PEMB with a main floor of 4854 SF and a mezzanine level of 371 SF. This building will house the apparatus bays, office, training room, restrooms, storage, and a decontamination room.


We are seeking proposals from trades including but not limited to: surveying, site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior specialties, plumbing, HVAC, electrical, and low voltage.
This is a Prevailing Wage Job

BIDS DUE:

6/10/2021

2 PM

Construction Summary:

This project consists of the construction of a new 10,640 SF Pre-engineered Metal Building with related site work, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC, and electrical.

We are seeking proposals from trades that would include, but are not be limited to: surveying, site work, site utilities, asphalt paving, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

BIDS DUE:

6/08/2021

2 PM

Construction Summary:

This project consists of the demolition of existing shop buildings and the construction of a multi-use work center and crew quarters. Scopes will include demolition, related site work, concrete, paving, fencing, wood framing, insulation, drywall, interior finishes, plumbing, HVAC, and electrical.

 

This Project is Prevailing Wage.

BIDS DUE:

6/07/2021

2 PM

Construction Summary:

This project consists of the construction of a new 9,100 SF Pre-engineered Metal Building with related site work, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC, and electrical.

We are seeking proposals from trades that would include, but are not be limited to: surveying, site work, site utilities, asphalt paving, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

BIDS DUE:

6/06/2021

2 PM

Construction Summary:

This project consists of the construction of a new 9,100 SF Pre-engineered Metal Building with related site work, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC, and electrical.

We are seeking proposals from trades that would include, but are not be limited to: surveying, site work, site utilities, asphalt paving, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

BIDS DUE:

6/01/2021

2 PM

Construction Summary:

This project consists of the construction of a new 9,100 SF Pre-engineered Metal Building with related site work, demolition, concrete, paving, masonry, metal stud framing, insulation, drywall and finishes, plumbing, HVAC, electrical and building removal.

We are seeking proposals from trades that would include, but are not be limited to: asbestos abatement, demolition, surveying, site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

PROJECTS IN CONSTRUCTION

Dollar General - Castle Rock, WA

Completing

Sept. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Morton, WA

Completing

Aug. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Kittitas, WA

Completing

Aug. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Umatilla, OR

Completing

Jul. 2021

Dollar General Store - New 7,500 SF Pre-Engineered building and all associated site work.

Dollar General - John Day, OR

Completing

Jun. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Burbank, WA

Completing

Jun. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Milton Freewater, OR

Completing

May. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Benton City, WA

Completed

Feb. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Naches, WA

Completed

Feb. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Granger, WA

Completed

Feb. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

 Dollar General - Zillah, WA

Completed

Feb. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Connell, WA

Completed

Feb. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Dollar General - Veneta, OR

Completed

Feb. 2021

Dollar General Store - New 9,100 SF Pre-Engineered building and all associated site work.

Multiple Site Gates & Turnstiles - Douglas, AZ - Naco, AZ, Lukeville, AZ and San Luis, AZ

Completed

Feb. 2021

Construction and installation of gates, turnstiles and associated fencing.