We are currenty accepting quotes on the following projects:

 

Nov 15, 2019

Bids Due by 12pm

Front Street Station Renovation

This project with the Rogue Valley Transportation District includes the renovation of the Front Street Station which consists of the alteration of an existing Type VB, non-sprinklered, Group B RVTD building including: remodel existing space and the addition of 800 sf divided between ground and a second story.

AMENDMENT #001 HAS BEEN ISSUED

AMENDMENT #002 HAS BEEN ISSUED
 

Sub contractor questions due by 11.13.19 COB

Nov 06, 2019

Bids due 11:00 am

Dollar General - Turner, OR

The Work includes construction of a new 9,100 SF Pre-engineered building and associated site improvements. We are seeking proposals from trades that would include, but are not be limited to: Surveying, Site work, site utilities, asphalt paving, landscaping, concrete foundation, concrete flat-work, masonry, PEMB erection, drywall, painting, interior Specialties, plumbing, HVAC, electrical, low voltage. This project included national accounts that will be utilized.

Nov 19, 2019

bids due by 11am

Dollar General - Morton, WA

Project Narrative coming soon

Please reload

Current projects under construction

Dec 31, 2019

This project is underway- we are accepting proposals for select divisions

Laredo Canine Facility

We are currently accepting subcontractor and vendor proposals for the construction of a new 8,000 sf K9 Facility at the World Trade Bridge Land Port of Entry, Laredo Texas.  The building consists of a pre-engineered building, concrete footings, slab on grade, CMU constructed walls, metal stud framing, drywall, acoustical ceilings, epoxy flooring and many other architectural features/  This project will be starting at the beginning of May for and run for a duration of approximately 8 months.

This project is a Federal project and is subject to Davis Bacon Wages and Federal Regulations.  The project documents are SBU documents and are subject to completion of SBU security documents.  Please email your request for the project documents to proposals@collabconst.com

Oct 07, 2019

Still Accepting Proposals for select divisions

Drive Thru Coffee/Cafe

This project is a Collaborative Construction Solutions, LLC project. We are seeking subcontractor bids for the construction of a 4,151 SF mixed use building. The building includes ground floor retail, a live/work unit and 4 residential units on the second floor. Building is composed of hardie cement panel siding  and brick veneer exterior,  new vinyl windows and aluminum storefront, structural concrete, concrete slab-on-grade, interior finishes, doors and all associated site work. Mechanical - Electrical - Plumbing - Fire Suppression are design build. - This project is anticipated to break ground the end of Feb. 2019. Direct all questions to the Collaborative office, do not contact the owner, Architect or engineers.

Please reload